品牌中杰特装
型号CFL-20/2.16
类型低温储罐
材质16MnDR
适用物料LCO2
注意事项matters need attention
在您购买我公司的设备之际,请接收我们诚挚的谢意。我们严格按标准和工艺进行制造,但由于安装和使用的不当,仍会引起意外事故。本使用说明书所示安全事项是为了您能安全正确的使用本设备,防止您或他人的危害或损害于未然,一旦实施错误的操作方法,其产生的后果均与安全有关。请接受本使用说明书的指导,并注意如下事项:
Please receive our sincere thanks for your purchase of our equipments. We manufacture in strict accordance with standards and craftsmanship, but will still cause accidents due to improper installation and use. The safety instructions in this manual are for the purpose of safe and correct use of this equipment, to prevent the harm to you or others from harm or damage, and once the wrong operation method is implemented, all the consequences arising therefrom are safety related. Please accept the instructions in this manual, and note the following:
1本设备属于特种设备,要设专职人员管理与操作,操作人员要经过培训持证上岗,否则由于误操作和使用,会造成危及生命安全的可能。
The equipment belongs to special equipment, which should be managed and operated by full-time personnel. Operators should be trained and certified to be on duty. Otherwise, it will be possible to endanger life safety due to misoperation and use.
2 本设备的安装、使用及维修应符合JB6898-1997《低温液体贮运设备 使用安全规则》的规定。本设备应放在室外、通风良好的场所。CO2有很强的窒息性,会引起窒息危险,甚至危及生命。
the installation, use and maintenance of the equipment shall conform to the provisions of JB6898-1997 "safe rules for the use of cryogenic liquid storage and transportation equipment". The equipment should be placed outdoors and well ventilated. CO2 has a strong asphyxiation, which can cause choking hazards and even life.
3 本设备贮存的是-40℃的低温液体,管道、阀门冻结堵塞时严禁用重物敲击、火烤或冷水喷淋等方法解冻,应用70~80℃干净无油的热空气、热氮气解冻。
this equipment is to 40 ℃ cryogenic liquid storage, pipe, valves, frozen jams it is forbidden to use heavy percussion, fire, or cold water spray method of thawing, application of 70 ~ 80 ℃ clean hot air, hot nitrogen release without oil.
【产品详情图片】
【变量3】【变量2】【变量1】
技术参数 Technical Parameters
【产品详情图片】
容 器 类 别 Tank Type:Ⅱ类
介质 Medium:LCO2
设 计 压 力 Design Pressure: 2.2MPa
允许工作压力Max. Allowance working pressure: 2.27MPa
容 积 Volume :10.5m3
材料Materials:
内胆Liner:16MnDR
外胆 Shell:Q345R
规格Specifications:
内胆 Liner:φ1600×8/8
外胆 Shell:φ2100×8/8
总重 Weight:7600kg
夹层保温材料Sandwich insulation material:
CEP60型珠光砂(含水量≤0.3%) CEP60 pearl sand (water content ≤0.3%)
内胆气压试验 Liner pressure test:
介质 Medium:氮气 Nitrogen 试验压力 test pressure:2.61MPa
内胆内管材料Liner tube materials:S30408
阀门 Valve:低温不锈钢三段式球阀 cryogenic stainless steel three stage ball valve
制造验收标准 manufacturing accept standards:
According to GB/T 18442-2011 Stationary vacuum insulated cryogenic pressure vessel
TSG 21-2016 Safety technical supervision procedures for fixed pressure vessels
【产品详情图片】
【变量3】【变量2】【变量1】
充液的操作 filling operation
【标题】
充液分为充液和补充充液。
充液的操作如下:
Filling fluid is divided into the first filling and filling fluid.
The first filling operation is as follows:
2.1.1 储罐吹除置换干净达到要求后,将充液管线与储罐的充液接头连接,液位计组合阀处于平衡状态准备充液。
After the tank blows off to replace the cleanliness meets the requirements, the filling liquid line is connected with the liquid filling joint of the tank, and the liquid level gauge combination valve is in an equilibrium state to be filled.
2.1.2充入与液体二氧化碳纯度相同的气体,使罐内压力达到0.8 Mpa以上,方可进行充液。 filled with the same purity of liquid carbon dioxide gas, the tank pressure reached 0.8 Mpa above, before filling.
2.1.3 将充液管线接通槽车,先开启V5残液阀,排出管线内的杂质气体后,再开启V1进液阀和V7排气阀,V8液位计组合阀处于全开状态,显示液位计读数进行充液。
The filling liquid line connected tanker, first open the V5 raffinate valve, exhaust gas impurities within the pipeline, and then open the V1 inlet valve and V7 exhaust valve, V8 level gauge combination valve is fully open state, Display level meter readings are filled.
2.1.4 在充液过程中,当液位计指示液位接近标定值时,可间断开启V4充满指示阀,如有液体喷出,应立即停止充液,关闭V4充满指示阀。
During the filling process, when the liquid level gauge indicates the liquid level approaches the calibration value, the V4 may be intermittently opened to indicate the valve. If any liquid is ejected, liquid filling should be stopped immediately and the V4 valve should be closed.
2.1.5关闭V1进液阀和V7排气阀,打开V5残液阀,拆下充液管线,充液结束。
补充充液的操作与充液的操作方法相似,不同点是补充充液时一开始就可以大量充液。
Close the V1 inlet valve and the V7 exhaust valve, open the V5 residual valve, remove the filling line, and fill with liquid.
The procedure for replenishing the priming solution is the same as for the first priming procedure, except that the priming solution can be replenished extensively from the beginning.
【产品详情图片】
【标题】
结构说明 Structure Description
1. 泄放装置 Discharge device
2. 内胆 Liner
3.保温层(珠光砂) Insulation (pear sand)
4.外壳 Shell
5.仪表(差压计、氧压表、组合阀) Meter (differential pressure gauge, oxygen pressure gauge, combination valve)
6.抽空口及真空阀门Evacuation port and vacuum valve
7.管路阀门 Pipeline Valve
说 明Description:
⑴本储罐的操作系统多集中于储罐底部,仪表系统及组合阀设置在筒壁,便于观察操作.
The operating system of the tank and more concentrated in the bottom of the tank, instrument system and valve combination set in the cylinder wall, easy to observe the operation.
(2) 内胆设置有两个安全阀S1、S2,夹层泄压装置B。
There are two safety valves S1, S2 inside the liner, sandwich pressure relief device B.
(3) 连接形式:进液口→2"螺纹连接,排液阀→2"螺纹连接,抽空口→法兰.
Connection: inlet → 2 "thread connection, drain valve → 2" thread connection, exhaust port → flange.
【产品详情图片】
【变量3】【变量2】【变量1】
-/gjehec/-